Skip to main navigation Skip to search Skip to main content

Task scheduling for project product based on workflow

  • Xin Hua Liu*
  • , Tian Guo Jin
  • , Wen Jian Liu
  • *Corresponding author for this work
  • School of Mechatronics Engineering, Harbin Institute of Technology

Research output: Contribution to journalArticlepeer-review

Abstract

This study intends to propose an intelligent methodology with the integration of CBR and fuzzy comprehensive evaluation. Task division structure was designed and CBR-based task division flowchart was put forward. Moreover, an algorithm based on fuzzy comprehensive evaluation was applied to realize task assignment automatically; a model based on workflow for task visual detection and monitor was established. In the terms of this theory, the prototype system was designed and the methodology was proved efficient and intelligent.

Original languageEnglish
Pages (from-to)260-264
Number of pages5
JournalDongbei Daxue Xuebao/Journal of Northeastern University
Volume28
Issue numberSUPPL. 1
StatePublished - Jul 2007
Externally publishedYes

Keywords

  • CBR
  • Fuzzy comprehensive evaluation
  • Project product
  • Task scheduling
  • Workflow

Fingerprint

Dive into the research topics of 'Task scheduling for project product based on workflow'. Together they form a unique fingerprint.

Cite this