Abstract
This study intends to propose an intelligent methodology with the integration of CBR and fuzzy comprehensive evaluation. Task division structure was designed and CBR-based task division flowchart was put forward. Moreover, an algorithm based on fuzzy comprehensive evaluation was applied to realize task assignment automatically; a model based on workflow for task visual detection and monitor was established. In the terms of this theory, the prototype system was designed and the methodology was proved efficient and intelligent.
| Original language | English |
|---|---|
| Pages (from-to) | 260-264 |
| Number of pages | 5 |
| Journal | Dongbei Daxue Xuebao/Journal of Northeastern University |
| Volume | 28 |
| Issue number | SUPPL. 1 |
| State | Published - Jul 2007 |
| Externally published | Yes |
Keywords
- CBR
- Fuzzy comprehensive evaluation
- Project product
- Task scheduling
- Workflow
Fingerprint
Dive into the research topics of 'Task scheduling for project product based on workflow'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver