Abstract
A minimum load shedding approach is proposed to restore post-contingency system solvability. Using the damped Newton-Raphson method, the system minimum mismatch function is calculated to identify the weakest bus and determine the most effective load shedding strategy. The weakest bus voltage of minimum mismatch solution is set as known parameter and the scaling load coefficient of the shedding load bus as unknown in the power flow equations, then solve the modified mismatch function to estimate the minimum amount of load shedding. The amount can be refined by a simple PV curve method. The proposed approach is illustrated with the New-England 39-bus system and the IEEE30-bus system. The results show that the approach is very simple and efficient and is easy to be implemented.
| Original language | English |
|---|---|
| Pages (from-to) | 27-31 |
| Number of pages | 5 |
| Journal | Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering |
| Volume | 25 |
| Issue number | 1 |
| State | Published - 1 Jan 2005 |
| Externally published | Yes |
Keywords
- Electric power engineering
- Minimum mismatch function
- Power flow solvability
- Power system
- Undervoltage load shedding
- Voltage collapse
Fingerprint
Dive into the research topics of 'Study on a undervoltage load shedding strategy based minimum mismatch function'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver