Abstract
Taking the block manufacturing of shipbuilding as the background, a mathematical model of the spatial resource constrained project scheduling problem was proposed by modeling of different kinds of resource. On the basis of the serial scheduling scheme and heuristic two-dimensional spatial scheduling algorithm developed from configuration space theory, a spatial resource constrained project scheduling algorithm based on artificial bee colony was provided. An experiment compared with the different algorithms in the corresponding data scale was made and the result showed that the better scheduling scheme could be achieved in a short computational time.
| Original language | English |
|---|---|
| Pages (from-to) | 1088-1098 |
| Number of pages | 11 |
| Journal | Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS |
| Volume | 20 |
| Issue number | 5 |
| DOIs | |
| State | Published - May 2014 |
| Externally published | Yes |
Keywords
- Artificial bee colony
- Configuration space
- Project scheduling
- Spatial resource
Fingerprint
Dive into the research topics of 'Spatial resource constrained project scheduling algorithm based on artificial bee colony'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver