Abstract
To improve the efficiency of resource management for building product design process, focused on resource management and optimization under the product design information constraint, the formulization of building a resource management model for product design process based on fuzzy timed colored workflow net (FTCWF-net) is presented, which strengthens the supports of resource management model for the system dynamic fuzzy time constraint relation, and resolves key problems in simulation and optimization. Then a resource management model based on FTCWF-net is proposed in structural detailed design process for an official building. The CPN Tools software is used for simulation analysis and optimization of resource management to test the validity and actual effect.
| Original language | English |
|---|---|
| Pages (from-to) | 122-126 |
| Number of pages | 5 |
| Journal | Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology |
| Volume | 41 |
| Issue number | 6 |
| State | Published - Jun 2009 |
| Externally published | Yes |
Keywords
- Building product design
- Fuzzy timed colored workflow net
- Optimization
- Resource management
- Simulation
Fingerprint
Dive into the research topics of 'Simulation and optimization of resource management for building product design process'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver