Abstract
An approach to sequence planning for on-orbit assembly of large space truss structures in a multirobot environment is presented. A hierarchical representation of large space truss structures at the structural volume element level and strut level is adopted. The representation of connectivity matrix and directed graph is respectively presented at the strut level and SVE level. The multirobot environment that consists of autonomous space robots and struts is supposed. Then the multirobot serial assembly strategy, assembly states, assembly tasks and assembly sequences are described. The assembly sequence planning algorithms at the strut level and SVE level are respectively discussed. The results of the simulations show that this approach is feasible and efficient. Two extensions of this approach include more accurate assessment of the efficiency representation and improvements in planning algorithm. In the future, the assembly sequence planning of more large space truss structures and complex multirobot environments and assembly tasks will be considered.
| Original language | English |
|---|---|
| Pages (from-to) | 319-324 |
| Number of pages | 6 |
| Journal | Wuhan Ligong Daxue Xuebao/Journal of Wuhan University of Technology |
| Volume | 28 |
| Issue number | SUPPL. 1 |
| State | Published - Nov 2006 |
Keywords
- Assembly planning
- Autonomous space robot
- Large space truss structures
Fingerprint
Dive into the research topics of 'Sequence planning for on-orbit assembly of large space truss structures in a multirobot environment'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver