Scheduling optimization of design stream line for production research and development projects

  • Qinming Liu*
  • , Xiuli Geng
  • , Ming Dong
  • , Wenyuan Lv
  • , Chunming Ye
  • *Corresponding author for this work
  • University of Shanghai for Science and Technology
  • Shanghai Jiao Tong University

Research output: Contribution to journalArticlepeer-review

Abstract

In a development project, efficient design stream line scheduling is difficult and important owing to large design imprecision and the differences in the skills and skill levels of employees. The relative skill levels of employees are denoted as fuzzy numbers. Multiple execution modes are generated by scheduling different employees for design tasks. An optimization model of a design stream line scheduling problem is proposed with the constraints of multiple executive modes, multi-skilled employees and precedence. The model considers the parallel design of multiple projects, different skills of employees, flexible multi-skilled employees and resource constraints. The objective function is to minimize the duration and tardiness of the project. Moreover, a two-dimensional particle swarm algorithm is used to find the optimal solution. To illustrate the validity of the proposed method, a case is examined in this article, and the results support the feasibility and effectiveness of the proposed model and algorithm.

Original languageEnglish
Pages (from-to)896-914
Number of pages19
JournalEngineering Optimization
Volume49
Issue number5
DOIs
StatePublished - 4 May 2017
Externally publishedYes

Keywords

  • Design stream line
  • design task
  • execution modes
  • multi-skilled employees
  • scheduling