Abstract
This paper studies the scheduling of design projects in concurrent development process with uncertain number of feedback revisions. An optimization based methodology that combines heuristic algorithm, artificial intelligence (fuzzy, genetic algorithm) and scheduling theory is developed. In the algorithm, weighting values of some key factors are defined by genetic algorithm. In addition, fuzzy logic is used to decide the ability coefficients of different roles taken by designers. Moreover, the process of pre-release and feedback revision is realized. Simulation example is a fraction of practical development project, and satisfied results are obtained.
| Original language | English |
|---|---|
| Pages (from-to) | 82-86 |
| Number of pages | 5 |
| Journal | Journal of Systems Engineering and Electronics |
| Volume | 12 |
| Issue number | 2 |
| State | Published - 2001 |
| Externally published | Yes |
Keywords
- Concurrent engineering
- Optimization scheduling
- Product development process
Fingerprint
Dive into the research topics of 'Scheduling of development projects with uncertain iterations'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver