Skip to main navigation Skip to search Skip to main content

Risk analysis model of aerospace engineering project incorporating human and organization factors

  • School of Management, Harbin Institute of Technology

Research output: Contribution to journalArticlepeer-review

Abstract

The mechanism of project risk caused by human and organization factors was revealed, and a model of risk analysis for aerospace engineering project incorporating the human and organization factors based on the mechanism was proposed. Based on the model, the quality of spacecraft component manufacturing considering the human and organization factors was evaluated, and then the consistency probability between the operational task quality and the different types of defect was assessed, and the defect severity was calculated according to Poisson distribution.Finally, the prior default rate of component was updated based on Bayesian theorem. The model framework was validated by an aerospace engineering project with modified data.

Original languageEnglish
Pages (from-to)60-65+76
JournalChinese Space Science and Technology
Volume32
Issue number1
DOIs
StatePublished - Feb 2012
Externally publishedYes

Keywords

  • Aerospace engineering project
  • Bayesian theorem
  • Human and organization factors
  • Risk analysis

Fingerprint

Dive into the research topics of 'Risk analysis model of aerospace engineering project incorporating human and organization factors'. Together they form a unique fingerprint.

Cite this