Abstract
With the Songhuajiang tunnel built in Harbin as an example, both the optimization analysis and the finite element numerical analysis are used to simulate different cases and site conditions, and the redistribution of secondary earth stress produced by shield tunneling is studied through numerical simulating experiments to evaluate the influence of various factors on the soil deformation and to identify the most dangerous failure location beforehand.
| Original language | English |
|---|---|
| Pages (from-to) | 428-432 |
| Number of pages | 5 |
| Journal | Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology |
| Volume | 35 |
| Issue number | 4 |
| State | Published - Apr 2003 |
| Externally published | Yes |
Keywords
- Finite element numerical simulation
- Secondary earth stress
- Shield method execution
- Tunnel
Fingerprint
Dive into the research topics of 'Redistribution of secondary earth stress produced by shield tunneling'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver