Abstract
Repeated loading five times was applied to concrete specimens using WHY series full automatic testing machine, the maximum loading was 0.4fcy (axial compressive strength) and 0.8fcy. In order to analyze the relationship between slag replacement, loading, and permeation time, the chloride ion concentration in anode chamber was measured during the accelerated chloride permeation test of concrete after unloading. The chloride ion concentration in the anode chamber was linear with respect to time after a stage time. The results show that, in the case of 0.4fcy, the permeability of concrete increases significantly. The permeability of concrete has a further increment when the stress level rises from 0.4fcy to 0.8fcy. Adding ground slag in concrete can inhibit the increment of concrete permeability due to the loading. The inhibition increases with the replacement of ground slag when the replacement is no more than 30%, while the inhibition decreases when the replacement is 40%.
| Original language | English |
|---|---|
| Pages (from-to) | 352-356 |
| Number of pages | 5 |
| Journal | Shenzhen Daxue Xuebao (Ligong Ban)/Journal of Shenzhen University Science and Engineering |
| Volume | 24 |
| Issue number | 4 |
| State | Published - Oct 2007 |
| Externally published | Yes |
Keywords
- Chloride ion
- Concrete
- Permeability
- Repeated loading
- Slag
Fingerprint
Dive into the research topics of 'Permeability of slag concrete under repeated loading'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver