Abstract
Working out reasonable and practical production schedules and controlling them effectively are complicated problems in the single-piece and mall-batch production enterprises. Through analysing the main characteristics of the enterprises, the project structure with sub-programs constrained by the network graph of key parts is established. A mode of operational planning and controlling is presented which combines network planning with MRP. A MRP decomposing algorithm for sub-programs is also proposed and a corresponding example is shown. The MRP based on the proposed mode and algorithm is realized and implemented to the Harbin Electric Motors Co. Ltd.
| Original language | English |
|---|---|
| Pages (from-to) | 425-428 |
| Number of pages | 4 |
| Journal | Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS |
| Volume | 8 |
| Issue number | 6 |
| State | Published - Jun 2002 |
Keywords
- MRP
- Network planning
- Operational planning and controlling
- Single-piece and small-batch production
Fingerprint
Dive into the research topics of 'Network planning/MRP method in single-piece and small-batch production'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver