Abstract
Three on-site septic tanks, namely ABR-septic tank(R1), YDT-carrier-septic tank(R2) and traditional septic tank(R3), were operated in parallel over a three-month period under the hydraulic retention times (HRT) of 36 hours at sewage temperature of 14~29°C. The achieved CODtot removal efficiencies in R1 and R2 increased by 30.5% and 9.2%, respectively, compared with R3 at the stage of 24°C, while the value reduced to 10. 9% and 9% in the phase of 16°C. The achieved removal efficiencies of TN and NH4+-N arrived at 5%~30%, and the value of TP was negligible, with approximately 5%. R1 achieved a better specific methane production rate as compared to R2 and R3. The two modified septic tanks improve biochemical characters and attain better removal efficiency for domestic sewage. The results provide a technical support and a theoretical basis for the modification of septic tank.
| Original language | English |
|---|---|
| Pages (from-to) | 1267-1272 |
| Number of pages | 6 |
| Journal | Chinese Journal of Environmental Engineering |
| Volume | 7 |
| Issue number | 4 |
| State | Published - Apr 2013 |
Keywords
- ABR-septic tank
- Domestic sewage
- Start-up phase
- Traditional septic tank
- YDT-carrier-septic tank
Fingerprint
Dive into the research topics of 'Experiment on start-up phase of new modified septic tanks treating domestic sewage'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver