Evaluation of transmission expansion scheme based on physical programming

  • Ying Shao*
  • , Jilai Yu
  • *Corresponding author for this work
  • Harbin Institute of Technology

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Due to the requirements on capital investment and performance level for real transmission expansion planning. In order to seek satisfying transmission system expansion plan and fully reflect subjective preferences of decision maker. In this paper, physical programming is presented to solve the evaluation of transmission expansion scheme. Investment cost for new transmission lines and power grid vulnerability are considered in physical programming model. Test results on IEEE-RTS 24-bus power system show that the proposed method can reflect the experts' preference and avoid the conflict between different objective functions with different dimension, and it is practicable.

Original languageEnglish
Title of host publicationAPPEEC 2012 - 2012 Asia-Pacific Power and Energy Engineering Conference, Proceedings
DOIs
StatePublished - 2012
Event2012 Asia-Pacific Power and Energy Engineering Conference, APPEEC 2012 - Shanghai, China
Duration: 27 Mar 201229 Mar 2012

Publication series

NameAsia-Pacific Power and Energy Engineering Conference, APPEEC
ISSN (Print)2157-4839
ISSN (Electronic)2157-4847

Conference

Conference2012 Asia-Pacific Power and Energy Engineering Conference, APPEEC 2012
Country/TerritoryChina
CityShanghai
Period27/03/1229/03/12

Keywords

  • Power system
  • evaluation
  • physical programming
  • transmission expansion planning
  • vulnerability assessment

Fingerprint

Dive into the research topics of 'Evaluation of transmission expansion scheme based on physical programming'. Together they form a unique fingerprint.

Cite this