Skip to main navigation Skip to search Skip to main content

Corrigendum to “A performance data integrated BIM framework for building life-cycle energy efficiency and environmental optimization design” [Automation in Construction, Volume 127 (2021), 103712] (Automation in Construction (2021) 127, (S0926580521001631), (10.1016/j.autcon.2021.103712))

  • Dian Zhuang
  • , Xinkai Zhang
  • , Yongdong Lu
  • , Chao Wang
  • , Xing Jin
  • , Xin Zhou
  • , Xing Shi*
  • *Corresponding author for this work

Research output: Contribution to journalComment/debate

Abstract

The authors regret <missing the affiliation ‘a School of Architecture, Southeast University, 2 Si Pai Lou, Nanjing 210096, China’ in the affiliation list of the corresponding author. The affiliation a is now added to the first unit of the affiliation list of the corresponding author.> The authors would like to apologise for any inconvenience caused.

Original languageEnglish
Article number104870
JournalAutomation in Construction
Volume151
DOIs
StatePublished - Jul 2023
Externally publishedYes

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Fingerprint

Dive into the research topics of 'Corrigendum to “A performance data integrated BIM framework for building life-cycle energy efficiency and environmental optimization design” [Automation in Construction, Volume 127 (2021), 103712] (Automation in Construction (2021) 127, (S0926580521001631), (10.1016/j.autcon.2021.103712))'. Together they form a unique fingerprint.

Cite this