Abstract
Uncertainties will lead to discrepancies between the actual and planned construction schedules. To know and solve these discrepancies timely, Monte Carlo method (MCM) is combined with Building Information Modeling (BIM) to establish a MCM-and-BIM-based construction schedule early warning model (MCM-BIM-CSEWM). Then, this paper develops a system prototype of MCM-BIM-CSEWM and explains its specific work processes through a large practical office building construction project. The results show that MCM-BIM-CSEWM can not only address the logical relationship between construction activities but also visually implement early warning according to construction-duration probability rather than construction duration in comparison with the traditional early warning models or systems.
| Original language | English |
|---|---|
| Pages (from-to) | 877-888 |
| Number of pages | 12 |
| Journal | Journal of Intelligent and Fuzzy Systems |
| Volume | 32 |
| Issue number | 1 |
| DOIs | |
| State | Published - 2017 |
| Externally published | Yes |
Keywords
- BIM
- Construction schedule
- MCM
- early warning
Fingerprint
Dive into the research topics of 'Construction schedule early warning from the perspective of probability and visualization'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver