Skip to main navigation Skip to search Skip to main content

Buffeting reliability analysis of long span concrete-filled steel tube arch bridge during construction stage

  • Yan Li*
  • , Jun Ma
  • , Hongfei Shen
  • , Li Hui Yin
  • , Li Wang
  • , Zheng Jun Wang
  • *Corresponding author for this work
  • School of Transportation Science and Engineering, Harbin Institute of Technology
  • Heilongjiang University

Research output: Contribution to journalArticlepeer-review

Abstract

In construction stage, a large buffeting response would endanger construction safety and quality for a long span concrete-filled steel tube (CFST) arch bridge. Developing the study on buffeting security is indispensable to CFST arch bridge in construction stage. Combining random vibration analysis of structure with modern probability theory, taking an actual large span CFST arch bridge as example, dynamic reliability of buffeting responses research and analysis is developed, which is based on the buffeting analysis on time domain at the longest cantilever construction stage. The paper gives quantitative valuation on wind-vibration safety performance of the bridge in construction phase and offers a new thought and reference for homologous project.

Original languageEnglish
Pages (from-to)55-62
Number of pages8
JournalKey Engineering Materials
Volume540
DOIs
StatePublished - 10 Mar 2013
Externally publishedYes

Keywords

  • Arch bridge
  • Buffeting
  • Concrete-filled steel tube
  • Construction stage
  • Dynamic reliability

Fingerprint

Dive into the research topics of 'Buffeting reliability analysis of long span concrete-filled steel tube arch bridge during construction stage'. Together they form a unique fingerprint.

Cite this