Abstract
Aiming at the planning of block-building operation place configuration for multiple projects in shipbuilding enterprises under advanced ship building policy, various complicated constraints for Block-building Operation Place Configuration Problem(BOPCP) were analyzed. Then, difference volumes which incorporated time and space criterion for evaluation of BOPCP were presented, and optimization model for multiple project BOPCP was established. In order to solve BOPCP, some heuristic rules in different stages were put forward and afterwards, a heuristic algorithm based on optimization and combination of rules was designed. Finally, the proposed algorithm was verified by simulation experiments.
| Original language | English |
|---|---|
| Pages (from-to) | 605-614 |
| Number of pages | 10 |
| Journal | Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS |
| Volume | 17 |
| Issue number | 3 |
| State | Published - Mar 2011 |
| Externally published | Yes |
Keywords
- Block-building
- Heuristic algorithms
- Operation place configuration
- Optimization algorithm
- Shipbuilding
Fingerprint
Dive into the research topics of 'Block-building operation place configuration problem for shipbuilding enterprises'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver