N2 - Flexible production lines are the mainstream choice in the current manufacturing industry. In a flexible line, a single machine can execute a variety of processing tasks. Machine breakdowns are common unexpected disturbances in manufacturing. Machine breakdowns in a flexible production line that result in the unexpected shutdown of the flexible production line's operation unit will have a significant influence on the overall manufacturing process. A two-stage dynamic scheduling strategy is used in this paper to solve the problem that the repair time of the machine cannot be accurately estimated when the machine fails in the production process of the flexible production lines. When any machine fails or is repaired, this strategy is used to set up the best production schedule for flexible production lines. The two-stage scheduling strategy can avoid estimating the repair time of the machine so that dynamic scheduling can be carried out accurately according to the actual situation. The imperialist competitive algorithm(ICA) is originally suitable for continuous optimization problems, while this problem falls within the category of discrete optimization. In this paper, the idea of hybridization of genetic algorithm is used to improve the ICA, so that it is suitable for discrete optimization problems to solve dynamic scheduling. Experiments demonstrate the effectiveness of the two-stage dynamic scheduling strategy and the improved imperialist competitive algorithm.
AB - Flexible production lines are the mainstream choice in the current manufacturing industry. In a flexible line, a single machine can execute a variety of processing tasks. Machine breakdowns are common unexpected disturbances in manufacturing. Machine breakdowns in a flexible production line that result in the unexpected shutdown of the flexible production line's operation unit will have a significant influence on the overall manufacturing process. A two-stage dynamic scheduling strategy is used in this paper to solve the problem that the repair time of the machine cannot be accurately estimated when the machine fails in the production process of the flexible production lines. When any machine fails or is repaired, this strategy is used to set up the best production schedule for flexible production lines. The two-stage scheduling strategy can avoid estimating the repair time of the machine so that dynamic scheduling can be carried out accurately according to the actual situation. The imperialist competitive algorithm(ICA) is originally suitable for continuous optimization problems, while this problem falls within the category of discrete optimization. In this paper, the idea of hybridization of genetic algorithm is used to improve the ICA, so that it is suitable for discrete optimization problems to solve dynamic scheduling. Experiments demonstrate the effectiveness of the two-stage dynamic scheduling strategy and the improved imperialist competitive algorithm.
KW - Flexible production line
KW - dynamic scheduling
KW - imperialist competitive algorithm
KW - machine breakdown
UR - https://www.scopus.com/pages/publications/85146305660
U2 - 10.1109/IAI55780.2022.9976820
DO - 10.1109/IAI55780.2022.9976820
M3 - 会议稿件
AN - SCOPUS:85146305660
T3 - 4th International Conference on Industrial Artificial Intelligence, IAI 2022
BT - 4th International Conference on Industrial Artificial Intelligence, IAI 2022
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 4th International Conference on Industrial Artificial Intelligence, IAI 2022
Y2 - 24 August 2022 through 27 August 2022
ER -