Skip to main navigation Skip to search Skip to main content

An integrated environment-cost-time optimisation method for construction contractors considering global warming

  • Kailun Feng
  • , Weizhuo Lu
  • , Shiwei Chen
  • , Yaowu Wang*
  • *Corresponding author for this work
  • Harbin Institute of Technology
  • Luleå University of Technology

Research output: Contribution to journalArticlepeer-review

Abstract

Construction contractors play a vital role in reducing the environmental impacts during the construction phase. To mitigate these impacts, contractors need to develop environmentally friendly plans that have optimal equipment, materials and labour configurations. However, construction plans with optimal environment may negatively affect the project cost and duration, resulting in dilemma for contractors on adopting low impacts plans. Moreover, the enumeration method that is usually used needs to assess and compare the performances of a great deal of scenarios, which seems to be time consuming for complicated projects with numerous scenarios. This study therefore developed an integrated method to efficiently provide contractors with plans having optimal environment-cost-time performances. Discrete-event simulation (DES) and particle swarm optimisation algorithms (PSO) are integrated through an iterative loop, which remarkably reduces the efforts on optimal scenarios searching. In the integrated method, the simulation module can model the construction equipment and materials consumption; the assessment module can evaluate multi-objective performances; and the optimisation module fast converges on optimal solutions. A prototype is developed and implemented in a hotel building construction. Results show that the proposed method greatly reduced the times of simulation compared with enumeration method. It provides the contractor with a trade-off solution that can average reduce 26.9% of environmental impact, 19.7% of construction cost, and 10.2% of project duration. The method provides contractors with an efficient and practical decision support tool for environmentally friendly planning.

Original languageEnglish
Article number4207
JournalSustainability (Switzerland)
Volume10
Issue number11
DOIs
StatePublished - 14 Nov 2018

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • Construction contractor
  • Construction planning
  • Discrete-event simulation
  • Environment-cost-time optimisation
  • Particle swarm optimisation

Fingerprint

Dive into the research topics of 'An integrated environment-cost-time optimisation method for construction contractors considering global warming'. Together they form a unique fingerprint.

Cite this