Abstract
The performance of combined BAF-MBR processes in treating the municipal wastewater of a town in southern China was investigated. The experimental results demonstrated that the processes were able to remove most pollutants from the wastewater. The average concentrations of COD, NH4+-N, TN, and TP in the final effluent were 7.11, 0.16, 8.85, and 0.34 mg·L-1, respectively, meeting the requirements for effluent reuse. When simultaneous chemical removal of phosphorus for the BAF effluent was performed in the subsequent MBR, with a FeSO4·7H2O dosage of 20 mg·L-1, the effluent TP concentration was 0.34 mg·L-1, while the membrane fouling was aggravated to some extent. However, when 30 mg·L-1 of Al2(SO4)3·18H2O was used instead of FeSO4·7H2O, the effluent TP concentration was 0.33 mg·L-1, and membrane fouling could be effectively alleviated.
| Original language | English |
|---|---|
| Pages (from-to) | 4945-4950 |
| Number of pages | 6 |
| Journal | Chinese Journal of Environmental Engineering |
| Volume | 10 |
| Issue number | 9 |
| DOIs | |
| State | Published - 5 Sep 2016 |
Keywords
- Advanced wastewater treatment
- Chemical removal of phosphorus
- Combined BAF-MBR processes
- Membrane fouling
- Nitrogen and phosphorus removal
Fingerprint
Dive into the research topics of 'Advanced wastewater treatment with simultaneous removal of phosphorus in combined BAF-MBR processes'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver