Active dispatch for interconnected power system considering coordination of tie line power schedule and peak climbing demand

  • Tao Zhu*
  • , Jilai Yu
  • *Corresponding author for this work
  • Harbin Institute of Technology
  • Yunnan Electric Power Dispatching Center

Research output: Contribution to journalArticlepeer-review

Abstract

Close is the correlation between frequency regulation, peak load and tie-line regulation in the interconnected power system. In the process of peak climbing, how to prevent the impact of the interconnected power system support on the tie-line and solve the problem of AGC units lacking capacity is the key problem in the peak active dispatch. This paper builds a model for coordinating optimal dispatching of peak climbing for the interconnected power system. The units relating to tie-line can be procured by an electrical dissection algorithm in the sending and receiving network at the first peak climbing stage. Then the regulating capacities of NON-AGC units in the sending and receiving network are checked and NON-AGC units are divided into two unit groups, the regulating capacity short and regulating capacity abundant group. In the process of peak climbing, firstly, the units relating to tie-line is dispatched so as to maintain the scheduled power of tie-line. Then various units in the sending and receiving network are coordinated at the same time, including the NON-AGC units and AGC units, as well as the regulating capacity short and regulating capacity abundant unit groups. The case analysis demonstrates the feasibility of the model proposed.

Original languageEnglish
Pages (from-to)34-38
Number of pages5
JournalDianli Xitong Zidonghua/Automation of Electric Power Systems
Volume32
Issue number1
StatePublished - 10 Jan 2008

Keywords

  • Coordinating optimal dispatch
  • Electrical dissection
  • Interconnected power system
  • Peak load regulation