Abstract
This study is devoted to handle disturbances occurring in a subway network during the off-peak period. By dissecting the relationship of transfer connections between connected lines, transfer passengers and non-transfer passengers as well as operating agencies are taken into consideration, respectively, and a trade-off method for timetable rescheduling is proposed to minimize the waiting time of all transfer passengers as well as the deviation from the planned timetable. We adopt the -constraint method to convert the bi-objective model to an integer linear programing model with single objective, which can be solved by CPLEX within seconds. The method is validated by some numerical experiments based on a real-world case derived from the Beijing Subway network. Results show that the proposed method is able to generate approximate Pareto optimal solutions and to provide decision support for dispatchers.
| Original language | English |
|---|---|
| Article number | 2050253 |
| Journal | Modern Physics Letters B |
| Volume | 34 |
| Issue number | 24 |
| DOIs | |
| State | Published - 30 Aug 2020 |
| Externally published | Yes |
Keywords
- Timetable rescheduling
- the -constraint method
- the off-peak period
- timetable deviation
- transfer connection
- transfer waiting time
Fingerprint
Dive into the research topics of 'A trade-off method for timetable rescheduling considering transfer connections in subway networks'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver