A novel heuristic algorithm for Spatial Resource Constrained Project Scheduling Problem

  • School of Computer Science and Technology, Harbin Institute of Technology
  • Huaqiao University

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Spatial resources such as slipway and erection platform are key and bottleneck resources for large equipment manufacturing enterprises, and restrict output and efficiency of enterprises. Spatial resource has several distinct features, such as spatiality, divisibility, adjacency, exclusivity and group characteristic. These features introduce great complexities into spatial Resource Constrained Project Scheduling Problem (sRCPSP), which lead sRCPSP very hard to model and solve. So a mathematical model for sRCPSP considered all features and other renewable resource constrains comprehensively has been established. Then an Activity Type Priority based Serial Scheduling heuristic method and a Resource-Time Block based Spatial Resource Allocation Method have been proposed to solve the model. Results of numerical experiments proved that those two algorithms are correct and effective.

Original languageEnglish
Title of host publicationInformation Technology for Manufacturing Systems II
Pages1448-1453
Number of pages6
DOIs
StatePublished - 2011
Externally publishedYes
Event2011 International Conference on Information Technology for Manufacturing Systems, ITMS 2011 - Shanghai, China
Duration: 7 May 20118 May 2011

Publication series

NameApplied Mechanics and Materials
Volume58-60
ISSN (Print)1660-9336
ISSN (Electronic)1662-7482

Conference

Conference2011 International Conference on Information Technology for Manufacturing Systems, ITMS 2011
Country/TerritoryChina
CityShanghai
Period7/05/118/05/11

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy

Keywords

  • Activity type priority
  • Project scheduling
  • Resource-time block
  • Spatial resource