Skip to main navigation Skip to search Skip to main content

A constraint satisfaction neural network and heuristic combined approach for concurrent activities scheduling

  • Ji Hong Yan*
  • , Cheng Wu
  • *Corresponding author for this work
  • University of Wisconsin-Milwaukee
  • Tsinghua University

Research output: Contribution to journalArticlepeer-review

Abstract

Scheduling activities in concurrent product development process is of great significance to shorten development lead time and minimize the cost. Moreover, it can eliminate the unnecessary redesign periods and guarantee that serial activities can be executed as concurrently as possible. This paper presents a constraint satisfaction neural network and heuristic combined approach for concurrent activities scheduling. In the combined approach, the neural network is used to obtain a feasible starting time of all the activities based on sequence constraints, the heuristic algorithm is used to obtain a feasible solution of the scheduling problem based on resource constraints. The feasible scheduling solution is obtained by a gradient optimization function. Simulations have shown that the proposed combined approach is efficient and feasible with respect to concurrent activities scheduling.

Original languageEnglish
Pages (from-to)252-257
Number of pages6
JournalJournal of Computer Science and Technology
Volume18
Issue number2
DOIs
StatePublished - Mar 2003
Externally publishedYes

Keywords

  • Concurrent engineering
  • Constraints satisfaction neural network
  • Heuristic
  • Product development process
  • Scheduling problem

Fingerprint

Dive into the research topics of 'A constraint satisfaction neural network and heuristic combined approach for concurrent activities scheduling'. Together they form a unique fingerprint.

Cite this