需求波动情况下千斤顶装配线的设计及应用

Translated title of the contribution: Design and Application of an Oil Jack Assembly Line in the Context of Demand Fluctuation
  • University of Shanghai for Science and Technology

Research output: Contribution to journalArticlepeer-review

Abstract

In order to solve the problem of the production quantity calculation instead of the estimation by the management personnel, and solve the design problem of assembly lines under seasonal demand fluctuation, some design plans and advices were presented. The newly designed assembly line was balanced and labor force was allocated. First, the production process of an oil jack assembly line was analyzed, and the standard operation time of each station was measured. Next, the oil jack assembly line was balanced and the production quantity with different takt time was calculated. Then, two new design plans were put forward under the requirements of flexible production, and the daily production quantity and average labor utilization were given as well. The research not only helps managers to solve the problem of the production quantity calculation instead of the estimation by management experience, but also solve the problem of the design of assembly lines under seasonal demand fluctuations.

Translated title of the contributionDesign and Application of an Oil Jack Assembly Line in the Context of Demand Fluctuation
Original languageChinese (Traditional)
Pages (from-to)358-363
Number of pages6
JournalShanghai Ligong Daxue Xuebao/Journal of University of Shanghai for Science and Technology
Volume40
Issue number4
DOIs
StatePublished - 1 Aug 2018
Externally publishedYes

Fingerprint

Dive into the research topics of 'Design and Application of an Oil Jack Assembly Line in the Context of Demand Fluctuation'. Together they form a unique fingerprint.

Cite this