Skip to main navigation Skip to search Skip to main content

重载铁路高路堤沉降预测及影响因素分析

Translated title of the contribution: Prediction of deformation and analysis of influence factors in heavy-haul railway high embankment
  • School of Civil Engineering, Harbin Institute of Technology
  • China University of Mining and Technology
  • Harbin Institute of Technology

Research output: Contribution to journalArticlepeer-review

Abstract

With the increase in the volume and the delivery times of heavy-haul railway, the settlement of embankment developes rapidly, thus the method of the settlement prediction of heavy-haul embankment is essential. According to the typicle conditions of Ba-Zhun Railway, a settlement prediction model which is based on empirical formulae and Abaqus nonlinear dynamic finite element method is proposed. And the parameter analyses on yearly settlement volume of embankment are carried out. The results show that the settlement of heavy-haul railway embankment rises rapidly in the first year, the total settlement of embankment is approximately linear because of the linear increase of the settlement of the ballast; the effect of ballast parameters on embankment settlement is greater than that of embankment surface layer; decreasing ballast thickness and increasing its modulus can promote the drop in embankment settlement.

Translated title of the contributionPrediction of deformation and analysis of influence factors in heavy-haul railway high embankment
Original languageChinese (Traditional)
Pages (from-to)26-34
Number of pages9
JournalBeijing Jiaotong Daxue Xuebao/Journal of Beijing Jiaotong University
Volume43
Issue number3
DOIs
StatePublished - 1 Jun 2019

Fingerprint

Dive into the research topics of 'Prediction of deformation and analysis of influence factors in heavy-haul railway high embankment'. Together they form a unique fingerprint.

Cite this